RETAIL STRIP

Location: Three story high street retail unit soft strip

Duration: 5 weeks

Descriptions: Strip out of a retail unit back to structural shell. 

Methodology: 

We where asked to soft strip a former BHS back to shell for the 3 story building to be sectioned off for new high street stores to occupy each floor.

All ceilings, walls and floors had to be removed back to concrete and brick. A brock excavator was used to demolish the original concrete stairs and also to break through the first and second floors to enable new lift shafts to be formed.

 