Jim Wise Demolition Begins Demolition Works at Stowupland High School
The works involve the complete demolition and clearance of the former Block E classrooms, bringing the buildings down to slab level to remove any potential fire or safety risks. The buildings are presumed to be steel framed with a timber and tile roof structure.