Project Overview

About This Project.

Jim Wise Demolition acted as principal contractor for the demolition of a redundant two-storey brick office block and attached garages at the Abriso Jiffy packaging plant on Road Two, Winsford Industrial Estate, Cheshire. The factory stayed in production throughout. Licensed and non-licensed asbestos was stripped from the buildings first, the elevations shared with the retained building were taken down by hand, a steel services gantry spanning the access road was cut out in sections from a scissor lift, and the structure was then demolished mechanically top-down with the arisings processed and removed on eight-wheel wagons.

3buildings demolished
Livefactory in production
1 mgantry cut sections
CAR 2012licensed & non-licensed removal

Scope of works

  • Asbestos removal — licensed and non-licensed asbestos-containing materials identified in the refurbishment and demolition survey removed before any strip or demolition, with independent air testing during the works at the client’s request and hazardous waste consignment notes for every load.
  • Soft strip — loose furniture, doors, casings, skirtings and floor finishes out first so the hardcore stayed clean; plasterboard and fittings segregated into dedicated 40-yard bins.
  • Hand demolition to the south-west elevations — the walls adjoining the building that stays were taken down by hand to protect the retained structure.
  • Steel services gantry — the bridge carrying services between the demolished block and the retained building was confirmed dead, then cut into one-metre sections from a scissor lift, each lowered to the skip, with the excavator grab cushioning the final member to the ground.
  • Mechanical demolition — 22-tonne excavator with grab and pulveriser, top-down in reverse order of construction: roof peeled in sections, walls reduced progressively in metre-square sections into the footprint, floor joists grabbed out individually.
  • Processing and clearance — concrete and brick munched free of rebar, dampened and loaded sheeted onto eight-wheel wagons; footprint tracked level for the next phase.
The Challenge

A Working Factory Next Door.

The office block sat hard against the operational plant, with the factory’s only wagon access to the rear shed running directly beneath the services gantry we had to remove. Nothing about the job could interrupt production. The method was built around three constraints: protect the retained building, keep the access road open, and keep every vehicle and plant movement under a banksman.

  • Retained structure — the shared south-west elevations came down by hand rather than by machine, and the demolition sequence ran away from the retained building so no wall was ever exposed at an unsafe height.
  • Access road — agreed with the client in advance, the road was closed only for the short window needed to drop the gantry, then reopened for the factory’s wagons.
  • Neighbours and the public — Heras-fenced exclusion zone, designated RoRo drop points, plant locked down overnight, and a banksman on every movement in and out of Road Two.
  • Dust — low plasterboard content kept internal dust down; the area was damped from a water supply during cutting and munching, with FFP3 respiratory protection on hand if levels rose.
  • Section 80 notice of demolition served on Cheshire West and Chester by the client; all works to BS 6187:2011.
Safe Delivery

How We Delivered It.

All works were carried out by Jim Wise Demolition’s directly employed team under a site-specific demolition phase plan prepared by our Demolition Manager and approved by our Managing Director, with SMSTS-qualified site management, CCDO and CPCS-carded operatives and UKATA-trained asbestos operatives, all face-fitted for FFP3 respiratory protection. Every operative was inducted and briefed daily against the method statement and signed to confirm it.

Overhead work from PASMA-inspected towers and the scissor lift ran under a written working-at-height rescue plan. Asbestos waste left site under uniquely numbered hazardous waste consignment notes; all other arisings under waste transfer notes by our own registered-carrier vehicles. A final inspection with the client’s team confirmed the site ready for handover, and the full documentation went into the health and safety file.

Jim Wise Demolition hold ConstructionLine Gold, SSIP Acclaim, HSE Licensed Asbestos Removal, NEBOSH, IOSH and are registered Waste Carriers — one contractor accountable from asbestos survey to cleared site. See our demolition contractors in Cheshire page for more work across the county.

Get in Touch

Start Your Project.

Tell us about your project and we’ll be in touch promptly with a free, no-obligation quote. We cover the whole of the UK.

We aim to respond within 2 hours during business hours.

No items found.

Ready to Start
Your Project?

Accreditations
ConstructionLine Gold
NEBOSH
IOSH
SSIP Acclaim
Once for All Verified
HSE Licensed Asbestos Removal
Waste Carriers Licence
Est. 1982
© 2026 Jim Wise Demolition Ltd · Registered in England & Wales · Company No. 06652826
Built & grown by Quiet Giants Group Ltd

Get a Free Quote

Typically respond within 2 hours — no obligation.

✓ Message Sent!

Thanks — we'll be in touch shortly.