Complex structural demolition for civil engineering and infrastructure projects — specialist plant, engineered sequences and experienced management of technically demanding works.
Jim Wise Demolition delivers demolition services on civil engineering and infrastructure projects — retaining walls, reinforced concrete structures, industrial chimneys, cooling towers, silos, bunkers and complex below-ground infrastructure.
Civil engineering demolition often involves the most technically complex and structurally challenging work in the sector. Our team brings the plant capability, engineering input and site management experience to deliver safely on projects that others decline.
Breaking out and removing heavily reinforced concrete structures — retaining walls, raft foundations, industrial floors and complex below-ground infrastructure.
Controlled demolition of industrial chimneys, silos, cooling towers and elevated structures — mechanical bite-down or selective deconstruction depending on site constraints.
Demolition of basement structures, culverts, underground tanks, tunnels and below-ground infrastructure — with full temporary works and groundwater management.
Structurally complex projects managed with engineered dismantling sequences, temporary propping design and close co-ordination with structural engineers.
On-site mobile crushing of reinforced and mass concrete arisings — reducing haulage costs and generating reusable aggregate on civil engineering sites.
Management of asbestos, contaminated concrete and other hazardous materials frequently found in industrial and civil engineering structures — all works licensed and documented.
Every commercial demolition project is delivered in full compliance with the applicable UK legislative and regulatory framework.
Yes — controlled demolition of chimneys, silos, cooling towers and elevated structures is a specialist capability. We use mechanical bite-down or selective deconstruction depending on the structure, height and site constraints.
Complex projects are planned with engineered dismantling sequences, structural engineer input and temporary works design where required. Full RAMS and Construction Phase Plans are produced before any works commence.
Yes — basement demolition, culvert removal, underground tank demolition and below-ground infrastructure removal are core capabilities, including groundwater management and temporary shoring.
Yes — industrial and civil engineering sites frequently contain contaminated concrete, asbestos and other hazardous materials. We manage all surveys, removal, documentation and disposal within the programme.
Yes — all surveys and quotations are free and carry no obligation. Fixed-price quotation within 24 hours.
Typically respond within 2 hours — no obligation.
Thanks — we'll be in touch shortly.